Spaceflight Now





The Mission




Orbiter: Discovery
Mission: STS-133
Payload: Leonardo
Launch: Feb. 24, 2011
Time: 4:53 p.m. EST
Site: Pad 39A, Kennedy Space Center
Landing: March 9 @
11:57 a.m. EST
Site: KSC's Shuttle Landing Facility

Mission Status Center

NASA TV (rev. L)

Master Flight Plan

Countdown timeline

Ascent events chart

Launch windows chart

SRB case history

STS-133 Video Coverage

High Definition Video

STS-133 Mission Index

Our Shuttle Archive




The Crew




Cdr Steve Lindsey

Pilot Eric Boe

MS 1 Al Drew

MS 2 Steve Bowen

MS 3 Mike Barratt

MS 4 Nicole Stott






Top Stories



Delta 2 rocket launch - A Delta 2 rocket lifts off with an international oceanography satellite.

ESA's lifting body - Europe's re-entry demonstrator should be approved soon for blastoff in late 2013.

Crew arrives at ISS - Next space station crew docks to orbiting complex in Soyuz capsule.

Voyager finds bubbles - The Voyager spacecraft has discovered signs of giant magnetic bubbles at the solar system's outer edge.

Rosetta goes to sleep - ESA's Rosetta comet-chasing spacecraft goes into hibernation.

Shuttle photo op - Spectacular photos of shuttle Endeavour docked to the space station.

Sea Launch update - Two missions are planned this year by Sea Launch from the Pacific Ocean and Kazakhstan.

Fresh crew launched - Reinforcements for the space station crew blast off on a Soyuz rocket.

Picking a destination - NASA will decide this summer where its next Mars rover will land.

Spirit's last images - A collection of the final photos returned from NASA's Spirit rover on Mars.

Atlantis on deck - Beautiful photos of shuttle Atlantis at sunrise on the launch pad.

Endeavour home - Concluding a 16-day mission, Endeavour returns to Earth for the final time.




Shuttle gaseous hydrogen vent line inspections begin
BY WILLIAM HARWOOD
STORY WRITTEN FOR CBS NEWS "SPACE PLACE" & USED WITH PERMISSION
Posted: November 9, 2010;
Updated at 9:30 p.m. with latest


Bookmark and Share

KENNEDY SPACE CENTER, FL--Engineers disconnected a 7-inch hydrogen vent line from a leaky quick-disconnect fitting on the side of the shuttle Discovery's external tank Tuesday that grounded the ship last Friday. Disassembly of the suspect fitting was expected overnight, with troubleshooters taking in situ photographs of the hardware, double-checking its alignment and looking for any obvious signs of trouble.


Credit: NTV
 
A detailed laboratory analysis of the quick-disconnect components is planned, but the fitting will not be re-attached. Instead, engineers plan to install replacement hardware by the end of the week that has a leak-free performance history.

Discovery's space station resupply flight is on hold until at least Nov. 30, the opening of the year's final shuttle launch window, while engineers work to resolve the leak, repair a large crack in the external tank's foam insulation and replace a circuit breaker that may have contributed to a subtle electrical glitch earlier last week.

Engineers also may carry out a fueling test, pumping supercold rocket fuel into Discovery's tank to make sure the replacement hardware is leak free, before pressing ahead with another round of launch preparations. But no final decisions have been made.

In any case, engineers say the foam crack may be the more significant challenge facing the launch team. It is not yet clear whether the damage is limited to the foam or whether the visible crack was caused by a defect of some sort in an underlying structural component. Repair plans are being developed to cover both scenarios.

Past leaks in the ground umbilical carrier plate, or GUCP, that connects a 7-inch hydrogen vent line to the side of the shuttle's external tank were blamed on temperature-induced trouble with internal seals, mechanical alignment of the hardware or both.

Extensive corrective actions were taken in the wake of two mission delays in 2009 and the system worked normally until Discovery's fueling Friday, a period covering 12 successful fuelings with six different tanks.

The vent line is used to carry excess hydrogen gas away from the shuttle as the tank is filled with super-cold propellant. During fueling, a valve is opened periodically to route hydrogen to the vent line as required to maintain the proper pressure in the tank. The excess gas is carried to a nearby "flare stack" where it is burned off. Just before launch, the vent valve is closed and the tank is pressurized for flight.


The arm was removed Tuesday evening. Credit: NTV
 
The vent line attaches to a port on the side of the external tank. At launch, an explosive charge fires, the quick-disconnect fitting separates and counterweights quickly pull the vent line down and out of the way.

During Discovery's fueling, sensors near the GUCP detected a major hydrogen leak about an hour after the three-hour tanking procedure began, well before the point where the earlier leaks showed up. Free hydrogen concentrations were above 6 percent, the limit of the sensors' ability to record, and the countdown was called off.

The vent line attachment fitting met specifications and passed pre-fueling tests, using helium at room temperature as a stand in for gaseous hydrogen. Because of the size of the leak, some engineers believe they will see an obvious defect when the hardware is taken apart and examined. Others are not so sure.

In parallel with the GUCP repair work, engineers are developing plans to repair a long crack that developed in the external tank's foam insulation during the fueling procedure Friday. Engineers began "dissecting" the damaged area overnight Tuesday, carefully cutting away the foam in the vicinity of the crack to expose underlying stringers and connecting panels.

If the underlying structure is sound, engineers likely will be cleared to spray on and shape new insulation to fill in the damage site. If temperature-induced stress or some other factor damaged the underlying structure, additional work could be required.

Repair crews also plan to remove circuit breaker panel L4 in the shuttle's cockpit Friday to troubleshoot a subtle electrical glitch that was blamed for one of Discovery's earlier launch delays last week. While "transient contamination" in one specific breaker may explain the problem, all 18 breakers in panel L4 will be replaced.

The official embroidered crew patch for shuttle Discovery's final flight is available in our store. Free shipping to U.S. addresses!
U.S. SHOPPERS | WORLDWIDE


Spaceflight Now Plus
Additional coverage for subscribers:
VIDEO: GASEOUS HYDROGEN VENT ARM DETACHED FROM SHUTTLE PLAY

VIDEO: STS-133 MISSION PREVIEW MOVIE PLAY | HI-DEF
VIDEO: SHUTTLE DISCOVERY CREW BIOGRAPHIES PLAY | HI-DEF
VIDEO: ISS EXPEDITION 25-26 PREVIEW MOVIE PLAY | HI-DEF
VIDEO: SPACE STATION CREW BIOGRAPHIES PLAY | HI-DEF

VIDEO: POST-SCRUB NEWS BRIEFING ON LEAK PLAY
VIDEO: GASEOUS HYDROGEN LEAK SCRUBS LAUNCH PLAY | HI-DEF
VIDEO: BAD WEATHER DELAYS DISCOVERY LAUNCH PLAY
VIDEO: ELECTRICAL ISSUE NO LONGER A CONCERN FOR DISCOVERY PLAY
VIDEO: LAUNCH POSTPONED BY ELECTRICAL CONCERN PLAY
VIDEO: TUESDAY MORNING'S COUNTDOWN STATUS CHECK PLAY
VIDEO: DISCOVERY'S PRE-LAUNCH NEWS CONFERENCE PLAY
VIDEO: COUNTDOWN PREVIEW BRIEFING AND WEATHER FORECAST PLAY
VIDEO: ANOTHER 24-HOUR DELAY ORDERED TO FINISH REPAIRS PLAY
VIDEO: LAUNCH DELAYED 24 HOURS BY LEAK REPAIRS PLAY

VIDEO: ASTRONAUTS ARRIVE FOR LAUNCH PLAY | HI-DEF

VIDEO: FLIGHT READINESS REVIEW SETS LAUNCH DATE PLAY

VIDEO: SHUTTLE AND STATION PROGRAM BRIEFING PLAY
VIDEO: THE STS-133 MISSION OVERVIEW PRESENTATIONS PLAY
VIDEO: PREVIEW BRIEFING ON MISSION'S SPACEWALKS PLAY
VIDEO: IN-DEPTH BACKGROUND ON ROBONAUT 2 HUMANOID PLAY
VIDEO: THE ASTRONAUTS' PRE-FLIGHT NEWS BRIEFING PLAY

VIDEO: PAYLOAD BAY DOORS CLOSED FOR LAUNCH PLAY | HI-DEF
VIDEO: CREW LEAVES KSC FOR TRIP TO HOUSTON PLAY | HI-DEF
VIDEO: ASTRONAUTS INSPECT THE PAYLOAD BAY PLAY | HI-DEF
VIDEO: SHUTTLE EVACUATION PRACTICE PLAY | HI-DEF
VIDEO: ASTRONAUTS EGRESS SHUTTLE AS SEEN LIVE PLAY
VIDEO: ASTRONAUTS BOARD DISCOVERY PLAY | HI-DEF
VIDEO: SUN RISES ON LAUNCH PAD 39A PLAY | HI-DEF
VIDEO: LAUNCH DAY REHEARSAL BEGINS PLAY | HI-DEF
VIDEO: COMMEMORATIVE WALL SIGNING IN VAB PLAY | HI-DEF
VIDEO: CREW BRIEFED ON EMERGENCY PROCEDURES PLAY | HI-DEF
VIDEO: IN SHUTTLE TRAINING AIRCRAFT'S COCKPIT PLAY | HI-DEF
VIDEO: TEST-DRIVING AN EMERGENCY ARMORED TANK PLAY | HI-DEF

VIDEO: PRE-LAUNCH INTERVIEW WITH STEVE LINDSEY PLAY
VIDEO: PRE-LAUNCH INTERVIEW WITH ERIC BOE PLAY
VIDEO: PRE-LAUNCH INTERVIEW WITH AL DREW PLAY
VIDEO: PRE-LAUNCH INTERVIEW WITH TIM KOPRA PLAY
VIDEO: PRE-LAUNCH INTERVIEW WITH MIKE BARRATT PLAY
VIDEO: PRE-LAUNCH INTERVIEW WITH NICOLE STOTT PLAY

VIDEO: PAYLOADS INSTALLED INTO DISCOVERY PLAY | HI-DEF
VIDEO: MISSION PAYLOADS ARRIVE AT LAUNCH PAD PLAY | HI-DEF
VIDEO: CANISTER HAULING PAYLOADS TURNED UPRIGHT PLAY | HI-DEF
VIDEO: MODULE HOISTED INTO SHIPPING CANISTER PLAY | HI-DEF
VIDEO: WEIGHING NEW SPACE STATION MODULE PLAY | HI-DEF

VIDEO: GANTRY PLACED AROUND DISCOVERY PLAY | HI-DEF
VIDEO: SHUTTLE ATLANTIS REACHES PAD 39A PLAY | HI-DEF
VIDEO: CROWDS WATCH DISCOVERY'S FINAL ROLLOUT PLAY | HI-DEF

VIDEO: SHUTTLE HOISTED FOR ATTACHMENT TO TANK PLAY | HI-DEF
VIDEO: CRANE ROTATES THE ORBITER VERTICALLY PLAY | HI-DEF
VIDEO: DISCOVERY DEPARTS ITS HANGAR PLAY | HI-DEF

VIDEO: TIME-LAPSE SHOWS DISCOVERY ASCENDING IN VAB PLAY
VIDEO: TIME-LAPSE SHOWS THE MOVE TO ASSEMBLY BUILDING PLAY

VIDEO: DISCOVERY'S MAIDEN FLIGHT: FIRST TRIP TO VAB PLAY
VIDEO: DISCOVERY'S MAIDEN FLIGHT: ROLLOUT TO PAD 39A PLAY
VIDEO: DISCOVERY'S MAIDEN FLIGHT: TEST-FIRING ENGINES PLAY
VIDEO: DISCOVERY'S MAIDEN FLIGHT: ASSORTED VIEWS OF FRF PLAY

VIDEO: THE HISTORY OF SHUTTLE DISCOVERY PLAY
VIDEO: THE HISTORY OF SHUTTLE ENDEAVOUR PLAY
VIDEO: THE HISTORY OF SHUTTLE ATLANTIS PLAY

VIDEO: INSPECTION OF THE MISSION PAYLOADS PLAY | HI-DEF
VIDEO: ROBONAUT ARRIVES AT KENNEDY SPACE CENTER PLAY | HI-DEF
VIDEO: SPACE STATION'S SPARE THERMAL RADIATOR PLAY | HI-DEF
VIDEO: BLANKETING LEONARDO WITH INSULATION PLAY | HI-DEF
VIDEO: RACK INSERTED INTO LEONARDO FOR LAUNCH PLAY | HI-DEF
VIDEO: LEONARDO RETURNS FROM ITS PREVIOUS FLIGHT PLAY | HI-DEF
VIDEO: STATION'S SPARE PARTS DEPOT ARRIVES PLAY | HI-DEF

VIDEO: ORBITER'S PAYLOAD BAY CLOSED FOR ROLLOUT PLAY | HI-DEF
VIDEO: ASTRONAUTS VISIT THEIR SPACECRAFT PLAY | HI-DEF
VIDEO: CREW INSPECTS LEONARDO MODULE PLAY | HI-DEF
VIDEO: DISCOVERY RECEIVES ITS MAIN ENGINES PLAY | HI-DEF
VIDEO: FUEL TANK MATED TO SOLID ROCKET BOOSTERS PLAY | HI-DEF
VIDEO: HOISTING FUEL TANK INTO CHECKOUT BAY PLAY | HI-DEF
VIDEO: EXTERNAL FUEL TANK UNLOADED FROM BARGE PLAY | HI-DEF
VIDEO: MISSION'S FUEL TANK ARRIVES AT SPACEPORT PLAY | HI-DEF

VIDEO: POST-FLIGHT DESERVICING: OMS POD PLAY | HI-DEF
VIDEO: POST-FLIGHT DESERVICING: OBSS BOOM PLAY | HI-DEF
VIDEO: POST-FLIGHT DESERVICING: ENGINES PLAY | HI-DEF
SUBSCRIBE NOW

Final Shuttle Mission Patch

Free shipping to U.S. addresses!

The crew emblem for the final space shuttle mission is now available in our store. Get this piece of history!
 U.S. STORE
 WORLDWIDE STORE

STS-134 Patch

Free shipping to U.S. addresses!

The final planned flight of space shuttle Endeavour is symbolized in the official embroidered crew patch for STS-134. Available in our store!
 U.S. STORE
 WORLDWIDE STORE

Ares 1-X Patch
The official embroidered patch for the Ares 1-X rocket test flight, is available for purchase.
 U.S. STORE
 WORLDWIDE STORE

Apollo Collage
This beautiful one piece set features the Apollo program emblem surrounded by the individual mission logos.
 U.S. STORE
 WORLDWIDE STORE

Project Orion
The Orion crew exploration vehicle is NASA's first new human spacecraft developed since the space shuttle a quarter-century earlier. The capsule is one of the key elements of returning astronauts to the Moon.
 U.S. STORE


Fallen Heroes Patch Collection
The official patches from Apollo 1, the shuttle Challenger and Columbia crews are available in the store.
 U.S. STORE
 WORLDWIDE STORE



INDEX | PLUS | NEWS ARCHIVE | LAUNCH SCHEDULE
ASTRONOMY NOW | STORE

ADVERTISE

© 2012 Spaceflight Now Inc.