Spaceflight Now




Spaceflight Now +



Subscribe to Spaceflight Now Plus for access to our extensive video collections!
How do I sign up?
Video archive

STS-126: The programs

In advance of shuttle Endeavour's STS-126 mission to the station, managers from both programs discuss the flight.

 Play

STS-126: The mission

A detailed preview of Endeavour's mission to deliver expanded crew accommodations to the station is provided in this briefing.

 Play

STS-126: Spacewalks

Four spacewalks are planned during Endeavour's STS-126 mission to the station.

 Play

STS-126: The Crew

The Endeavour astronauts, led by commander Chris Ferguson, meet the press in the traditional pre-flight news conference.

 Play

Shuttle rollaround

Space shuttle Endeavour switched launch pads on Oct. 23, traveling from pad 39B to pad 39A.

 Play

Two shuttles sighted

Stunning aerial views of shuttles Atlantis and Endeavour perched atop launch pads 39A and 39B on Sept. 20.

 Play | Hi-Def

Endeavour to the VAB

For its role as a rescue craft during the Hubble servicing mission and the scheduled November logistics run to the space station, Endeavour is moved to the Vehicle Assembly Building.

 Play

Become a subscriber
More video



Hardware swapped between station and shuttle
BY WILLIAM HARWOOD
STORY WRITTEN FOR CBS NEWS "SPACE PLACE" & USED WITH PERMISSION
Posted: November 18, 2008

Running almost an hour ahead of schedule, spacewalkers Heidemarie Stefanyshyn-Piper and Stephen Bowen have moved a depleted nitrogen tank from the space station to the shuttle Endeavour and transferred a spare coolant system component from the shuttle to the lab complex.

Bowen currently is focused on removing thermal covers from fittings on the Japanese Kibo research module that will be used next year to attach an external experiment platform. Stefanyshyn-Piper, meanwhile, will spend the rest of today's excursion cleaning and lubricating the station's right-side solar alpha rotary joint, a critical mechanism needed to turn outboard solar arrays to keep them face-on to the sun. Bowen will join her there when his work at the Kibo module is complete.

The port SARJ is operating normally, but the starboard rotary joint has suffered extensive degradation due to a presumed loss of lubrication. Cleaning metallic contamination, lubricating the three surfaces of the 10-foot-wide SARJ drive gear and replacing 11 of 12 bearing assemblies will take the rest of today, a full spacewalk Thursday and most of a third on Saturday.

Before today's work began, Stefanyshyn-Piper reported a grease gun apparently released a fair amount of lubrication inside her work bag, possibly the result of a pressure differential.

"It's kind of all over the inside of the bag," she reported.

The EVA started 36 minutes ahead of schedule when the two astronauts, floating in the international space station's Quest airlock module, switched their spacesuits to battery power at 1:09 p.m., officially beginning a planned six-and-a-half-hour spacewalk.

This is the 115th spacewalk in the 10 years since station assembly began, the sixteenth so far this year, the first of four for Endeavour's crew, the third overall for Stefanyshyn-Piper and the first for Bowen. Going into today's excursion, more than 80 astronauts and cosmonauts representing the United States, Russia, Japan, Canada, Germany, France and Sweden had logged 718 hours and 48 minutes of spacewalk asssembly time.

Spaceflight Now Plus
Additional coverage for subscribers:
VIDEO: SHOW-AND-TELL OF SOLAR ALPHA ROTARY JOINT WORK PLAY
VIDEO: WALKTHROUGH OF SPACEWALK NO. 1 PLAN PLAY
VIDEO: NARRATED ANIMATION OF SPACEWALK SWAPOUT PLAY
VIDEO: FLIGHT DIRECTOR'S SUMMARY OF FLIGHT DAY 5 PLAY

VIDEO: CREW OPENS HATCH AND ENTERS LEONARDO PLAY
VIDEO: ATLANTA AND BOSTON TV STATIONS INTERVIEW CREW PLAY
VIDEO: MONDAY'S MISSION MANAGEMENT TEAM UPDATE PLAY
VIDEO: MONDAY'S MISSION STATUS BRIEFING PLAY
VIDEO: LEONARDO MODULE SUCCESSFULLY MOUNTED TO STATION PLAY
VIDEO: MONDAY MORNING FLIGHT DIRECTOR INTERVIEW PLAY
VIDEO: PREVIEW ANIMATION OF LEONARDO MODULE ATTACHMENT PLAY
VIDEO: SUMMARY OF CARGO BEING DELIVERED TO SPACE STATION PLAY

VIDEO: FLIGHT DAY 3 HIGHLIGHTS MOVIE PLAY
VIDEO: SUNDAY'S MISSION STATUS BRIEFING PLAY
VIDEO: SHUTTLE CREW WELCOMED ABOARD STATION PLAY
VIDEO: SPACE SHUTTLE ENDEAVOUR DOCKS TO SPACE STATION PLAY
VIDEO: ENDEAVOUR PERFORMS THE 360-DEGREE BACKFLIP PLAY
VIDEO: VIEWS OF THE SHUTTLE APPROACHING FROM BELOW PLAY
VIDEO: FLIGHT DIRECTOR'S SUMMARY OF FLIGHT DAY 3 PLAY
VIDEO: PREVIEW ANIMATION OF RENDEZVOUS AND DOCKING PLAY

VIDEO: FLIGHT DAY 2 HIGHLIGHTS MOVIE PLAY
VIDEO: SATURDAY'S MISSION STATUS BRIEFING PLAY
VIDEO: SATURDAY'S MISSION MANAGEMENT TEAM UPDATE PLAY
VIDEO: FLIGHT DIRECTOR'S SUMMARY OF FLIGHT DAY 2 PLAY
VIDEO: PREVIEW ANIMATION OF HEAT SHIELD INSPECTIONS PLAY
VIDEO: NARRATED TOUR OF ENDEAVOUR'S PAYLOAD BAY PLAY

VIDEO: FLIGHT DAY 1 HIGHLIGHTS MOVIE PLAY
VIDEO: SPACE SHUTTLE ENDEAVOUR BLASTS OFF! PLAY
VIDEO: SPACEFLIGHT NOW'S LAUNCH PAD CAMERA PLAY
VIDEO: THE FULL STS-126 LAUNCH EXPERIENCE PLAY
VIDEO: INSIDE MISSION CONTROL DURING LAUNCH PLAY
VIDEO: POST-LAUNCH NEWS BRIEFING PLAY

VIDEO: FINAL PRE-LAUNCH POLLS GIVE "GO" FOR LIFTOFF PLAY
VIDEO: SHUTTLE'S CREW MODULE HATCH CLOSED FOR FLIGHT PLAY
VIDEO: MISSION SPECIALIST DON PETTIT BOARDS PLAY
VIDEO: MISSION SPECIALIST SHANE KIMBROUGH BOARDS PLAY
VIDEO: PILOT ERIC BOE BOARDS ENDEAVOUR PLAY
VIDEO: COMMANDER CHRIS FERGUSON BOARDS ENDEAVOUR PLAY
VIDEO: ASTROVAN TAKES CREW TO LAUNCH PAD 39A PLAY
VIDEO: CREW DEPARTS QUARTERS FOR LAUNCH PAD PLAY
VIDEO: ASTRONAUTS DON SPACESUITS FOR LAUNCH PLAY
VIDEO: NARRATED RECAP OF ENDEAVOUR'S PRE-FLIGHT CAMPAIGN PLAY
VIDEO: NARRATED RECAP OF PAYLOADS' PRE-FLIGHT CAMPAIGN PLAY

VIDEO: PAD 39A SERVICE GANTRY RETRACTED FOR LAUNCH PLAY
VIDEO: THURSDAY'S COUNTDOWN STATUS AND WEATHER UPDATE PLAY
VIDEO: WEDNESDAY'S PRE-LAUNCH NEWS CONFERENCE PLAY
VIDEO: ENDEAVOUR ASTRONAUTS ARRIVE FOR LAUNCH PLAY | HI-DEF
VIDEO: TUESDAY'S COUNTDOWN STATUS AND WEATHER UPDATE PLAY

VIDEO: STATION ASTRONAUTS PREPARE FOR SHUTTLE ARRIVAL PLAY
VIDEO: ENDEAVOUR'S PAYLOADS READIED FOR TREK TO SPACE PLAY

VIDEO: UPDATE ON SHUTTLE AND STATION PROGRAMS PLAY
VIDEO: STS-126 MISSION OVERVIEW PLAY
VIDEO: PREVIEW BRIEFING ON MISSION'S SPACEWALKS PLAY
VIDEO: THE ASTRONAUTS' PRE-FLIGHT NEWS BRIEFING PLAY

VIDEO: INTERVIEW WITH COMMANDER CHRIS FERGUSON PLAY
VIDEO: INTERVIEW WITH PILOT ERIC BOE PLAY
VIDEO: INTERVIEW WITH MS1 HEIDEMARIE PIPER PLAY
VIDEO: INTERVIEW WITH MS2 STEPHEN BOWEN PLAY
VIDEO: INTERVIEW WITH MS3 DON PETITT PLAY
VIDEO: INTERVIEW WITH MS4 SHANE KIMBROUGH PLAY
VIDEO: INTERVIEW WITH MS5 SANDY MAGNUS PLAY

VIDEO: INTERVIEW WITH SPACE STATION'S EXPEDITION 17 CREW PLAY

VIDEO: ENDEAVOUR COMMANDER AND PILOT PRACTICE LANDINGS PLAY

VIDEO: ISS PROGRAM MANAGER UPDATES SOYUZ INVESTIGATION PLAY
VIDEO: ISS PROGRAM MANAGER DESCRIBES SARJ REPAIR PLAN PLAY
VIDEO: ISS PROGRAM MANAGER DISCUSSES RADIATOR DAMAGE PLAY
VIDEO: EXPEDITION 18 PRE-FLIGHT MISSION BRIEFING PLAY

VIDEO: AERIAL VIEWS OF ATLANTIS AND ENDEAVOUR PLAY | HI-DEF
VIDEO: ENDEAVOUR AT SUNRISE ON LAUNCH PAD 39B PLAY | HI-DEF
VIDEO: AERIAL VIEWS OF ENDEAVOUR AFTER ROLLOUT PLAY | HI-DEF
VIDEO: ENDEAVOUR ROLLS FROM VAB TO LAUNCH PAD PLAY | HI-DEF
VIDEO: TIME-LAPSE MOVIE OF ARRIVAL AT PAD 39B PLAY
VIDEO: TIME-LAPSE MOVIE OF ENDEAVOUR LEAVING VAB PLAY

VIDEO: SHUTTLE HOISTED FOR ATTACHMENT TO TANK PLAY | HI-DEF
VIDEO: ENDEAVOUR'S DEPARTURE FROM HANGAR PLAY | HI-DEF

VIDEO: TIME-LAPSE MOVIE OF ENDEAVOUR GOING VERTICAL PLAY
VIDEO: TIME-LAPSE MOVIE OF BEING HOISTED OFF TRANSPORTER PLAY
VIDEO: TIME-LAPSE MOVIE OF ENDEAVOUR MOVING TO VAB PLAY
MORE: STS-126 VIDEO COVERAGE
SUBSCRIBE NOW