Spaceflight Now Home



The Mission




Rocket: Delta 2 (7420)
Payload: GeoEye 1
Date: Sept. 6, 2008
Window: 11:50:57 a.m. PDT (2:50:57 p.m. EDT)
Site: SLC-2W, Vandenberg Air Force Base, California

Mission Status Center

Launch events timeline

Ground track map

Delta 2 rocket info

The pre-launch flow

Space Launch Complex 2

Our Delta archive



NewsAlert



Sign up for our NewsAlert service and have the latest news in astronomy and space e-mailed direct to your desktop.

Enter your e-mail address:

Privacy note: your e-mail address will not be used for any other purpose.



Delta 335 launch timeline
SPACEFLIGHT NOW
Posted: August 29, 2008

T-00:00 Liftoff
The Delta 2 rocket's main engine and twin vernier steering thrusters are started moments before launch. The four strap-on solid rocket motors are ignited at T-0 to begin the mission.
T+01:04.0 SRB Burnout
The ground-start Alliant TechSystems-built solid rocket motors consume all their propellant and burn out.
T+01:22.5 Jettison SRBs
The spent solid rocket boosters are jettisoned to fall into the Pacific Ocean. The spent casings remained attached until the vehicle passed into preset drop zone, clear of offshore oil platforms.
T+01:25.0 Begin Dog-leg
After initially flying from Vandenberg along a 196-degree flight azimuth, the rocket begins steering itself to obtain the desired orbital inclination. This dog-leg maneuver continues for 35 seconds.
T+04:24.0 Main Engine Cutoff
After consuming its RP-1 fuel and liquid oxygen, the Pratt & Whitney Rocketdyne RS-27A first stage main engine is shut down. The vernier engines cut off moments later.
T+04:32.0 Stage Separation
The Delta rocket's first stage is separated now, having completed its job. The spent stage will fall into the Pacific Ocean.
T+04:37.5 Second Stage Ignition
With the stage jettisoned, the rocket's second stage takes over. The Aerojet AJ118-K liquid-fueled engine ignites for the first of two firings needed to place the GeoEye 1 spacecraft into the proper orbit.
T+04:41.5 Jettison Payload Fairing
The 10-foot diameter payload fairing that protected the GeoEye 1 cargo atop the Delta 2 during the atmospheric ascent is jettisoned is two halves.
T+11:25.1 Second Stage Cutoff 1
The second stage engine shuts down to complete its first firing of the launch. The rocket and attached spacecraft are now in a long coast period before the second stage reignites. The orbit achieved should be 380 nautical miles at apogee, 100 miles at perigee and inclined 98.06 degrees.
T+53:20.0 Second Stage Restart
Delta's second stage engine reignites for a short firing to raise the orbit's perigee.
T+53:33.5 Second Stage Cutoff 2
The second stage shuts down after a 13.5-second burn. The orbit achieved will be 369.7 nautical miles at apogee, 365.7 miles at perigee and inclined 98.122 degrees.
T+58:40.5 Payload Separation
The GeoEye 1 commercial Earth-imagery spacecraft is released from the Delta 2 rocket, completing the launch.

Data source: ULA.

Expedition 18 patch & pin
The official embroidered patch and lapel pin for the International Space Station Expedition 18 crew is now available to from our stores.
 U.S. STORE: PATCH | PIN
 WORLD STORE: PATCH | PIN

Ares patch
The Ares Project will develop two new rockets to launch astronauts back to the Moon under NASA's Vision for Exploration. The Ares 1 will employ a single space shuttle solid rocket booster to loft the Orion crew capsule. The gigantic Ares 5 will haul the equipment and cargo needed for such lunar voyages. This is the Ares emblem.
 U.S. STORE




Apollo patches
The Apollo Patch Collection: Includes all 12 Apollo mission patches plus the Apollo Program Patch. Save over 20% off the Individual price.
 U.S. STORE

Columbus mission patch
The official astronaut embroidered patch of Atlantis' STS-122 mission that launched the Columbus science lab in February is available to U.S. customers from our store.
 U.S. STORE
MISSION STATUS CENTER

INDEX | PLUS | NEWS ARCHIVE | LAUNCH SCHEDULE
ASTRONOMY NOW | STORE

ADVERTISE

© 2009 Spaceflight Now Inc.