Spaceflight Now Home



The Mission




Rocket: Delta 2 (7925)
Payload: THEMIS
Date: Feb. 17, 2007
Window: 6:01-6:19 p.m. EST (2301-2319 GMT)
Site: SLC-17B, Cape Canaveral, Florida

Video Coverage

Mission Status Center

Launch events timeline

Ground track map

Restricted hazard area

THEMIS overview

Delta 2 fact sheet

Pre-launch flow

Launch Complex 17

Archived Delta coverage



NewsAlert



Sign up for our NewsAlert service and have the latest news in astronomy and space e-mailed direct to your desktop.

Enter your e-mail address:

Privacy note: your e-mail address will not be used for any other purpose.



THEMIS launch timeline
SPACEFLIGHT NOW
Posted: February 12, 2007

T-00:00 Liftoff
The ULA Delta 2 rocket's main engine and twin vernier steering thrusters are started moments before launch. The six ground-start strap-on solid rocket motors are ignited at T-0 to begin the mission.
T+01:03.1 Ground SRM Burnout
The six ground-start Alliant TechSystems-built solid rocket motors consume all their propellant and burn out.
T+01:05.5 Air-Lit SRM Ignition
The three remaining solid rocket motors strapped to the Delta 2 rocket's first stage are ignited.
T+01:06.0 Jettison Ground SRMs
The six spent ground-started solid rocket boosters are jettisoned in sets of three to fall into the Atlantic Ocean.
T+02:11.5 Jettison Air-Lit SRMs
Having burned out, the three spent air-started solid rocket boosters are jettisoned toward the Atlantic Ocean.
T+04:23.3 Main Engine Cutoff
After consuming its RP-1 fuel and liquid oxygen, the Rocketdyne RS-27A first stage main engine is shut down. The vernier engines cut off moments later.
T+04:31.3 Stage Separation
The Delta rocket's first stage is separated now, having completed its job. The spent stage will fall into the Atlantic Ocean.
T+04:36.8 Second Stage Ignition
With the stage jettisoned, the rocket's second stage takes over. The Aerojet AJ10-118K liquid-fueled engine ignites for the first of two firings needed to place the upper stage and THEMIS satellites into the proper orbit.
T+04:41.0 Jettison Payload Fairing
The 10-foot diameter payload fairing that protected the THEMIS spacecraft atop the Delta 2 during the atmospheric ascent is jettisoned is two halves.
T+9:53.5 Second Stage Cutoff 1
The second stage engine shuts down to complete its first firing of the launch. The rocket and attached THEMIS spacecraft are now in a coast period before the second stage reignites. The orbit achieved should be 304 nautical miles at apogee, 100 miles at perigee and inclined 28.5 degrees.
T+64:19.4 Second Stage Restart
Delta's second stage engine reignites for a short firing that results in stepping the orbit higher.
T+65:15.1 Second Stage Cutoff 2
The second stage shuts down. The orbit achieved should be 825 nautical miles at apogee, 280 miles at perigee and inclined 26.58 degrees. Over the next minute, tiny thrusters on the side of the rocket will be fired to spin up the vehicle in preparation for stage separation.
T+66:08.1 Stage Separation
The liquid-fueled second stage is jettisoned from the rest of the Delta 2 rocket.
T+66:45.1 Third Stage Ignition
The Thiokol Star 48B solid-fueled third stage is ignited to deliver the THEMIS satellites into its intended orbit around Earth.
T+68:11.6 Third Stage Burnout
Having used up all its solid-propellant, the third stage burns out to completed the powered phase of the launch sequence for THEMIS.
T+73:00.1 THEMIS Separation
NASA's THEMIS spacecraft are deployed from the probe carrier structure mounted on the third stage. The top spacecraft, known as Probe A, is released first, followed three seconds later by the remaining four probes separating simultaneously. The Delta should have placed the satellites into an orbit with a high point of 49,592 nautical miles and low point of 235 nautical miles inclined 16 degrees.

Data source: ULA

Apollo Collage
This beautiful one piece set features the Apollo program emblem surrounded by the individual mission logos.
 U.S. STORE

STS-127 Patch
The official embroidered patch for shuttle Endeavour's flight to finish building Japanese section of the space station.
 U.S. STORE
 WORLDWIDE STORE



Hubble Patch
The official embroidered patch for mission STS-125, the space shuttle's last planned service call to the Hubble Space Telescope, is available for purchase.
 U.S. STORE
 WORLDWIDE STORE

Project Orion
The Orion crew exploration vehicle is NASA's first new human spacecraft developed since the space shuttle a quarter-century earlier. The capsule is one of the key elements of returning astronauts to the Moon.
 U.S. STORE


Fallen Heroes Patch Collection
The official patches from Apollo 1, the shuttle Challenger and Columbia crews are available in the store.
 U.S. STORE
 WORLDWIDE STORE
MISSION STATUS CENTER

INDEX | PLUS | NEWS ARCHIVE | LAUNCH SCHEDULE
ASTRONOMY NOW | STORE

ADVERTISE

© 2009 Spaceflight Now Inc.